Motobecane, Mobylette, Motoconfort Moped HT Lead 47 cm (Extra Long Lead)
£4.99
47 cm long (long version)
Make
All
Model
All
Type
Electrical
Availability: In stock
NEW replacement Hight Tension Voltage Lead for mopeds
An excellent quality part to assist smooth performance
Length 470 mm (longer version)
Suitable for using with the Novi Coils and NGK spark plug caps on the following mopeds. The lead pushes into the spike on the Novi Coil and the female screw cap is compatible with the NOVI coil male screw end
If you have the time to fit these leads do provide a very neat and tidy replacement to the originals. This longer length lead can be trimmed down should you require.
-Montgomery Ward
-Mobylette
-Motobecane
-Motoconfort
-Raleigh
-Phillips
To replace part numbers 16786 (Mobylette AV43 / AV44)


