My Cart

You have no items in your shopping cart.

Facebook Twitter Google Plus

Motobecane, Mobylette, Motoconfort Moped HT Lead 47 cm (Extra Long Lead)

£4.50
47 cm long (long version)
Product Code:
FJ47
  • Mobylette HT Lead Long

Mobylette HT Lead Long Click on above image to view full picture

Additional Information

Make All
Model All
Type Electrical
Availability: In stock

NEW replacement Hight Tension Voltage Lead for mopeds

An excellent quality part to assist smooth performance

Length 470 mm (longer version)

Suitable for using with the Novi Coils and NGK spark plug caps on the following mopeds. The lead pushes into the spike on the Novi Coil and the female screw cap is compatible with the NOVI coil male screw end

If you have the time to fit these leads do provide a very neat and tidy replacement to the originals. This longer length lead can be trimmed down should you require.

-Montgomery Ward

 -Mobylette

-Motobecane

-Motoconfort

-Raleigh

-Phillips

To replace part numbers 16786 (Mobylette AV43 / AV44)

Related Products